In early November, the final Local Stakeholder Workshop took place for our Leuven pilot in Constantin Meunierstraat. Together with local residents, we have tested, measured, and learned through the JUSTNature street installation since September 2023. These insights have now been translated into the final design for the street’s redevelopment.
Residents were able to explore the design through detailed plans and renders. The one-way traffic and traffic filter tested during the pilot proved successful and will remain in place. This change frees up space for green areas: the redesigned street will consist of 24% green space, while 16% permeable paving will ensure rainwater can infiltrate into the soil. In addition, the possibility of installing a district heating network beneath the street is still being explored.